• Project: Rehabilitation of Old Slurry building
  • Client: HOLCIM Cement Plant
  • Contractor: HECOTEC LLC
  • Project BOQ: 4050 M2 Area
Scope of Work
  • Project Management and Project Planning
  • Management of the Technical Changes
  • Preparation of the Project Specific Construction, QA/QC, and HSE Documentation
  • Topographical survey of the area
  • Leveling of the area after removal of the debris from the area
  • Compaction of the area
  • Formwork erection, rebar-mesh installation, pouring concrete
  • Quality control of the civil works
Scaffolding Projects: (cons)
  • The Dispensary Against Cancer No. 4
  • Baku Health Centre
  • SOCAR Administrative Building
  • Neftyol T.T.–Assembling of the scaffolds for concrete works
  • “Dada Gorgud” Submersible Drilling Rig
  • “Khankendi” Subsea Construction Vessel
Mechanical, Electrical and Plumbing Projects: (eng)
  • MEP works for Boiler Rooms of Schools. Ministry of Education of Azerbaijan Republic
  • -MEP works in pump rooms, boiler rooms and swimming pools of the dormitory camp for 514 people. AzeraqrarTikinti
  • Installation of the HVAC, plumbing systems, pump stations, fire and gas detection and fighting systems. Ministry of Agriculture of Azerbaijan Republic
  • Installation of the HVAC, boiler rooms, pump stations, plutmbing systems and F&G detection and fighting systems. Ministry of Defense of Azerbaijan Republic
Scaffolding Projects: (cons)
  • The Dispensary Against Cancer No. 4
  • Baku Health Centre
  • SOCAR Administrative Building
  • Neftyol T.T.–Assembling of the scaffolds for concrete works
  • “Dada Gorgud” Submersible Drilling Rig
  • “Khankendi” Subsea Construction Vessel