Piping & Instrumentation Engineering
- Pipe and Valve Sizing
- Preparation of the Piping & Instrumentation Diagrams (P&IDs)
- Preparation of the isometric drawings (ISOs) (Destruct and Spool Isometrics)
- Estimation of Material Take off (MTO)
- Preparation of preliminary manual/computer line stress calculations (including thermal, dead
weight, loop, etc.) with modeling, loading calculations and summaries of piping systems
- Selection of piping materials required and evaluation of service life and suitability
- Design and Development of New Control Systems
- Testing, Maintaining and Modifying Existing Control Systems
- Development of Instrumentation Datasheets, Loop Drawings, Diagrams and Installation Detail
Drawings
- Preparation of Equipment List
- Preparation of Torque and Tension Calculation Reports
- Preparation of Weight Control Sheet (Offshore Only)
- Preparation of Tie-in Reports (Survey, Tie-in Location Identification, Tie-In Location Plan,
Tie-in Detail Drawing)